Bildon Steel Bildon Steel

Modern Prefabricated Steel Structure Building Metal Space Frame for Factory Prefab Warehouse House Supermarket Sandwich Panel

Product Description

Steel Structure Banner
Products Description

Advantages of Steel Structure

  • High strength, strong bearing capacity, can bear huge load.
  • Light weight, reduce the base cost, good seismic performance.
  • Good plasticity and toughness, can absorb energy, resist dynamic load.
  • The construction period is short and the site installation is fast.
  • Large construction space, flexible installation.
  • Environmental protection, high steel recycling rate, less pollution.
  • Beautiful shape, can realize complex modeling.
Items Specification
Main Steel Structure Column Q235, Q355 Welded H Section Steel
Beam Q235, Q355 Welded H Section Steel
Secondary Frame Purlin Q235 C and Z purlin
Knee Brace Q235 Angle Steel
Tie Rod Q235 Circular Steel Pipe
Brace Q235 Round Bar
Maintenance System Roof Panel EPS/Glass fiber /Rock wool sandwich panel
Wall Panel Sandwich panel/ Corrugated Steel sheet
Accessories Window Aluminium alloy window/ PVC window/Sandwich panel window
Door Sliding sandwich panel door/Rolling metal door/Personal door
Structure Usage Up to 70 years
Finishing Options Vast array of color and texture available
Workshop/Warehouse
Workshop/Warehouse
Farm Poultry House
Farm Poultry House
Hangar/Garage
Hangar/Garage
Supermarket
Supermarket
Office/Hospital
Office/Hospital
Stadium/Exhibition Hall
Stadium/Exhibition Hall
Details Images
Details Showcase 1
Details Showcase 2
If you have drawings, welcome to share drawings with us, quotation will be done based your drawings. Our excellent design team will design the steel structure workshop warehouse for you. If you give the following information, we will give you a satisfactory drawing.
  • 1 Location (where will be built? ) which country? which city?
  • 2 Size: Length*width* Eave height _____mm*_____mm*_____mm
  • 3 Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
  • 4 Snow load (max. Snow height) _____kn/m2, _____mm, temperature range?
  • 5 Anti-earthquake _____level
  • 6 Brickwall needed or not If yes, 1.2m high or 1.5m high? or other?
  • 7 Thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal sheets will be ok. The cost of the latter will be much lower than that of the former.
  • 8 Door quantity & size _____units, _____(width)mm*_____(height)mm
  • 9 Window quantity & size _____units, _____(width)mm*_____(height)mm
  • 10 Crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m
Steel Structure Design
Design Plan Overview
3D Model Rendering
CAD Drawing Layout
Structural Engineering Design 1
Structural Engineering Design 2
Structural Engineering Design 3
Our factory has an experienced design department with more than 15 years of experience in designing many steel structure buildings. We can draw 3D modeling, graphic design, and construction drawings for you.
Why Choose Us
Production Advantage Summary
Certification Advantage 1
Certification Advantage 2
Certification Advantage 3
Production Workshop
Company Profile
Production Facility Office
Steel Manufacturing Line
We are a supplier of precision steel products. We are located in China's largest stainless steel product base. Our associated factories have the most advanced production equipment to ensure the most superior product quality. We have been committed to the steel industry for nearly 15 years and have trained many loyal customers in Europe, South America, the Middle East, India, and other places. All the products we provide are in strict compliance with international standards. We promise that almost all inquiries will be processed within 2 hours. "Punctuality, integrity, and humane service" has always been the development principle that our company has always adhered to.
Flame Cutting Step
First Step
Flame Cutting
Spot Welding Step
Second Step
Spot Welding
Submerge-arc Welding Step
Third Step
Submerge-arc Welding
Straighten Step
Fourth Step
Straighten
Manual Welding Step
Fifth Step
Manual Welding
Painting Step
Sixth Step
Painting
Production Process Finished Product
Customer
Customer Showcase Banner
Customer Inspection 1
Customer Inspection 2
Customer Project Site 1
Customer Project Site 2
Product packaging
Packaging Procedure 1
Packaging Procedure 2
Packaging Procedure 3
Shipping Container Loading
FAQ
Can I have a visit to your factory before the order?
A: Yes, welcome to visit our factory. You can fly to the nearest international airport, and then we will pick you up at the airport. Hotel booking service is available.
Do you support installation services?
A: Of course, we support installation guide service. We can send experienced engineers to your location to help guide you through the structure installation.
How long can the space frame structure be used?
A: The useful life of the main steel structure is about 50 to 100 years.
How long is the use life of the roof cover?
A: The useful life of the PE coating cladding/roof sheet is usually 10 to 25 years, depending on local conditions.
How do we cooperate on a certain project?
A: Firstly, please send us your project details and requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally, we can proceed with contract signing and manufacture scheduling.
What is the delivery time for a steel structure building?
A: The production lead time generally ranges from 30 to 45 days after receiving the advance payment and final confirmation of the structural drawings.

Related Products