Bildon Steel Bildon Steel

Fast Build Prefabricated Light Steel Structure Steel Space Frame Roof Indoor Basketball Tennis Sports Stadium Hall Building

Product Description

Steel Structure Header
Project Overview
Technical Specifications
Venue Specifications
Building Area Customized, common range: 5,000 - 50,000 cubic meters
Capacity 1,000 - 50,000 people (adjustable scale)
Building Height 8 - 30m
Structural Parameters
Span Maximum span up to 150m (trusses/grid structures)
Column Spacing 8 - 18m
Seismic Resistance 6 to 8 degrees
Steel Grade Q355, Q460
Yield Strength Q355: >355MPa | Q460: >460MPa
Protection Fireproof coating & Hot-dip galvanizing
Functional & Logistics
Daylighting Light-transmitting panels (>80% transmittance)
Construction Period Small: 2-3 months | Large: 4-8 months
Prefabrication Rate No less than 80%
Shipping Time 15 - 30 days
Port of Loading Tianjin
Structural Detail
Process 1
Process 2
Process 3
Design Plan
Recommend Products
Recommended Item
Project Showcase
Exhibition & Global Projects
Exhibition 1
Exhibition 2
Global Coverage
Factory Scene
Frequently Asked Questions
What are the main advantages of your steel structures?
We maintain an honest business approach with highly competitive pricing and professional service throughout the entire export process.
How is the product quality guaranteed?
We always provide a pre-production sample before mass production and conduct a mandatory final inspection before every shipment to ensure standards are met.
Is the raw material supply stable?
Yes, we maintain long-term cooperation relationships with eligible raw material suppliers, ensuring high quality from the very first step of production.
What are your specific quality control steps?
Our QC process includes: (1) Client confirmation before sourcing; (2) Material verification; (3) Training for experienced workers; (4) Full production process inspection; (5) Final loading inspection.
How long does it take to construct a steel structure venue?
Small venues typically take about 2 to 3 months, while larger venues or complex structures can take between 4 to 8 months.
What is your typical shipping and packaging method?
Shipping usually takes 15-30 days via Tianjin port. We use standard reinforced packaging, but customized packaging solutions are available upon request.
Quality Certification
Industrial Facility

Related Products