Bildon Steel
Industrial Design Sports Stadium Roof Steel Structure Pipe Truss Fast Delivery for Supermarket Office Building Gym Workshop
Price per square meter can be 25% lower than conventional buildings. Site erection cost is low because of faster erection times and easier process.
Designed and fabricated in-factory with strict quality control. The fabrication process includes design and engineering, as well as detailing and manufacturing at the factory.
All steel components are fabricated at the factory and linked by bolts at the site. So the erection process is fast, step-by-step, and easy to install.
Steel buildings are flexible in any requirement of design, easy to expand in the future and also economically advantageous with low transportation costs.
Nowadays, steel buildings are the green solution for the environment with CO2 reduction, energy efficiency, and high recyclability.
Industrial Design Sports Stadium Roof Steel Structure Pipe Truss Fast Delivery for Supermarket Office Building Gym Workshop
| Industrial Design Sports Stadium Roof Steel Structure Pipe Truss Fast Delivery for Supermarket Office Building Gym Workshop | |
|---|---|
| 1. Primary Framing | H column and beam |
| 2. Secondary Framing | Z and C sections purlin |
| 3. Roof and Wall panels | Steel sheet and insulated sandwich panels |
| 4. Steel Decking Floor | Decking board |
| 5. Structural Subsystem | Canopies, Fascias, Partitions, etc. |
| 6. Mezzanines, Platforms | Stainless steel gutter/UPVC gutter |
| 7. Other Building Accessories | Sliding Doors, Roll Up Doors, Windows, Louvers, etc. |
We are a company that has been engaged in the design and manufacture of high-quality prefabricated steel structure buildings for factories, shopping malls, warehouses, logistics centers, hangars, schools, etc. for 15 years. The plant is expected to be 500,000 square meters, with an annual production of 390,000 tons of light and heavy steel. With the purpose of customer satisfaction as the center and value creation as the guide, we pursue stable development and long-term goals, and 1 million square meters of roof panels.